
Fundamentals
of GD&T Web-Based Training
Based
on ASME Y14.5M-1994
Goals and Objectives
Lesson
24: Circular Runout
Goal: Interpret the circular runout control.
- Describe what
runout is.
- List two types
of runout controls.
- List three ways
a datum axis can be specified for a runout control.
- Explain what
circular runout is.
- Describe the
tolerance zone for a circular runout control (applied to a diameter).
- Describe how
circular runout can be inspected.
- Describe how
circular runout is a composite control.
- Determine the
maximum amount of axis offset from a circular runout control.
- Interpret a circular
runout application.
- Describe two
common applications for circular runout.
Lesson
25: Total Runout
Goal: Interpret the total runout control.
- Describe what
total runout is.
- List two requirements
of a total runout control.
- Describe the
tolerance zone for a total runout control (applied to a diameter).
- Describe how
total runout is verified.
- Describe how
total runout is a composite control.
- Determine the
maximum amount of axis offset from a total runout control.
- Describe two
similarities between circular and total runout.
- Describe two
differences between circular and total runout.
- Describe two
common applications for total runout.
|